Our Family

Apple New Year! This is a picture taken on December 28, 2012, of most of our Apple products we had with us during Christmas 2012. On the floor on the left is our first computer, bought in 1987. From the left: Sam, his wife Amber and their daughter Evelyn; Katie behind Suzie, her husband Adam with their son Tyson; Shelly and her husband Drew with their daughter Aubree between them and their daughter Kinzie on Drew's lap and their daughter Isabelle; Brian and his wife Brittany standing behind them, and Heidi and I.

Monday, October 25, 2010

Project #3 Tile (Part II)

On Saturday, we finally finished the last of our
three flooring projects. We started with carpet way
back in April. (You can see that post here).
Then we moved on to hardwood in May.
(You can see that post here).
After those two projects, we started our first tile
project in June with the laundry room.
(You can see that post here).

Now, on this post, are pictures of the second
part of our tile project- the kitchen.

Heidi and I sitting on the tile floor
after everything is completed.

A view of the finished project after all
the furniture and appliances are moved back in.

First, I want to show you some
'before' and 'after' pictures:

The 'before' picture of where the den
meets the kitchen.
Our old carpet covered the plywood up to
the linoleum on the right.
We wanted to cover that area with tile to
expand the eating area of the kitchen.
That took a bit of work, since the two floors
were at different heights.

The 'after' picture of the same area.

'Before' of the main part of the kitchen.

'After' picture of the main part of the kitchen.

The 'before' picture of the sliding door.

The 'after' picture of the sliding door.

'Before' from the other hallway.

'After' from the same hallway.
In the foreground you can see some
of the hardwood that we put down in
a previous project. Also, on the right
you can see some of the same tile that
we installed in the laundry room in June.

'Before' at the dishwasher,
sink and stove.

'After' at the same area.

'Before' at the refrigerator.

'After' at the refrigerator.

One last set of before/after pictures.
This is the 'before' by the sliding door.
The heat and sun turns the linoleum red to purple.

And the last 'after' picture.

Here is where almost everything ended up for the
six weeks it took us to complete this project.
Keep in mind though, most of the project was
done only on Saturdays.

The stove ended up in the garage.

Here are all the materials for the job.

The first thing we had to do was remove all the
quarter-round from the baseboard and store it.

Then I had to cut the linoleum edge straight
so we could work on the different heights
of the linoleum floor and the
section that was once carpeted.

Next, we cleaned the floor so we could put down
the backer-board.

We bought some backer-board that was a little
thicker than the rest, so we could bring up the height
on the low part of the floor. Then we cut and dry-fit
the backer-board before using mortar.

Heidi spreading mortar for the backer-board.
You can see some of the hardwood floor in the
hallway that we installed back in May.

We got about half way done with backer-board
on the first day. After using mortar, the
backer-board is screwed down about every 8 inches.

Here is what the mortar looks like.

And here is what it tastes like!
Not really.

Heidi beginning to mortar the second
half of the floor on another day.

We pulled out the stove after the backer-board
was mortared and screwed down elsewhere.
Then we cut and put down the backer-board where
the stove goes. That way, we didn't have to unhook the stove
and when the mortar was dry, we put the stove back
so we could still use it.

Heidi beginning to mortar the area
where the stove sits.

After all the backer-board was put down and cured,
we put some of the kitchen back together so
we could use it until we found time to continue
with the tile project.

After the backer-board is installed,
we put down a fiberglas seam tape .
We still had to build up the area where the two
floor heights came together.

The cat gave his stamp of approval.
We found this the next morning
as the mortar set overnight.

Time to tile.
First we marked lines across the floor
about three feet apart and at
90 degrees from each other too.

Then we dry-fit a row of tile in each direction
so we could tell where our cuts would be
around the perimeter of the room.

We wanted full tiles at the most visible part
of the room, and this is the place!

We got a lot done on the first day of tiling.

We used 1/4 inch spacers in the kitchen,
just like we did in the laundry room.

This is what it looked like after the
first day of tiling.

On the second day of tiling we tiled around the
kitchen island and cabinets.

Here is what it looked like
after the second day of tiling.
We intentionally left a trail of unfinished tile
so we could still use things in the kitchen.
The tile has to set for at least 24 hours
before you can walk on it, and we didn't want
to become stranded out of our own kitchen.

A few days later, the final areas were tiled.
The previously installed tile was cured by this time
and could be walked on to access things in the kitchen.
And it also made it easier to put the rest
of the tile down.

Installing tile in the area where the stove sits.

And here is how it looks with the tile installed
where the stove sits.

Ah, finally, the last tile!

Finished!
Now we just have to wait for it to cure.

While the tile set and cured, I had to fix
the transition where the carpet and tile meet.

The transition all complete and grouted.
I used a specially cut piece of hardwood
that matched our hardwood project.

But I am getting ahead of things.
The grouting pictures are below.

Some of the area under the base of the cabinets
was hard to get to for grouting, so we used
putty knives to work the grout in.
That other tool is a 'float' that is used to
put the grout in between the tiles.
The grout is drawn into the voids at an
angle, that way it doesn't also get scraped out.

Grouting the area where the stove sits.

Almost done grouting.

All done grouting. Next, after waiting three days
for the grout to cure, it's time to seal the tile.
Sealing waterproofs the grout and helps preserve it.

After sealing the grout and letting the sealer dry for
about three hours, it's time to put some things back.

Then we put the quarter-round back on
the baseboard and painted both.

Finally, we cleaned the refrigerator inside and out,
put it back, and hooked up the water and ice-maker.

Since we have been inside working on the tile for several
Saturdays, the fall weather has been beautiful.
So after we were done on Saturday, we got some
sub sandwiches at the place where Katie works,
and headed over the Maryland line to one of
the marinas on the Chesapeake Bay.
We found a place with a gazebo and chairs and
picnic tables along the Sassafrass River,
ate our subs and took a nice leisurely walk.

This is the gazebo we ate in, and it is right on the
boardwalk at the marina.

We really like the tile and are especially happy
that it is finally done. In fact, we are elated that
all the flooring projects (for this year, anyway)
are finished.
It was a fun project, even though we took forever
to finish since we had to confine
work to mostly Saturdays.

I don't know about Heidi, but I think I would
install tile again. We learned a lot and proved with all
the flooring projects we did this year, that if you have
patients, prepare and have the internet,
you can do any of this.

I think our next projects will be updating the paint and wallpaper
so it will match better with our new floors.

2 comments:

  1. The tile looks awesome! And- I love the Tech Shirt in the 1st pic!!

    ReplyDelete
  2. Wow, so much work and time went into that! I bet you are glad it is finally over! And I bet your bodies are still feeling the hard work. I love the before and after pics and really like the first and second picture.

    ReplyDelete