A week ago on Friday night, Heidi and I
started our tile project in the laundry room.
Here are some pictures of the project:

A 'before' picture looking into the garage.
That's part of the hardwood floor in the
foreground. We put that in earlier
this spring.

Here is a 'before' picture looking the opposite
direction in the laundry room.

Here is a 'before' picture of the small pantry
that is in the laundry room.

First, we had to take off the quarter-round
along the bottom of the baseboard.

We then cut and dry-fit the backer board.
After the backer board is all cut and fit,
We put mortar on the floor and lay down
the backer board. The backer board is made
from cement and fiberglas. We have to screw
down the backer board at least every eight inches.
The mortar levels out the floor and gets rid
of any voids, and the screws attach it to the sub-floor.
We left the vinyl floor installed and mortared
right on top of it. It doesn't matter about the vinyl
floor because the screws go right through it and
anchor to the sub-floor below.

Then we chalked some lines on the floor to
get perfect 90-degree angles to follow for
laying the tile. We then dry-fit the tile in
the whole room.

We used two different ways to cut the tile.
This is a tool that scores the tile, then snap it apart.
This was by far the fastest, easiest,
and cleanest of the two methods we used to cut tile.

We also used a tile wet-saw for those tiles with
angle cuts that the other cutter couldn't make.

Here is a picture of the spacers we used to get the correct
space between each tile. Spacers can be bought for
different widths between tiles.
We used 1/4 inch spacers.

Here is a picture of all the tile installed.

A different angle of the tile all installed.
The tile has to dry several hours before
you can walk on it.
the joints at roughly a 45-degree angle.

All grouted and time to clean up the tiles.
After letting the grout firm up a few minutes,
it's time to wipe up all the mess left on all the tiles.

After the grout is cured for a few days,
it gets sealed so it won't absorb water.
After the sealer is cured, it's time to paint thequarter-round and then install it along the baseboard.
Then install the washer and dryer, doors,
and put the pantry back together.
Compare the next three 'after' pictures
with the first three 'before' pictures
of this post:
the door to the garage.

And an 'after' picture of the pantry.
Now it is time to do a weeks-worth of laundry!
We started on a Friday evening and finished a week
later on a Saturday morning.
Our next project is to put the same tile in our kitchen.
That will have to wait until the end of the summer
because we are going out of town for a few weeks,
and then having family visit for a few weeks.






The tile looks great!! I love the color too! Good job mom & dad!!
ReplyDeleteGlad I could see the finished product in person. It looks awesome and goes really well with the hard wood floors.
ReplyDelete